Monday, April 4, 9 p.m. to 5 a.m.
General Lane Closures & Traffic Pacings:
- Two left lanes on SR 400 southbound from Spalding Drive to Pitts Road
- One left lane on SR 400 northbound from Pitts Road to Spalding Drive
- One right lane on I-285 westbound from Lake Forrest Drive to Riverside Drive
- Two right lanes on I-285 eastbound from Mount Vernon Highway to Lake Forrest Drive
Click here to view the full details and detour information.
Subscribe for email updates on this project here: https://dot.us20.list-manage.com/subscribe?u=85e8270674fc9a47b18bf99be&id=92621e6905
For real-time construction & traffic conditions, visit 511ga.org or download the Georgia 511 app (available in Google Play and Apple App Store).